Newberry Resurfacing - SW 257thSt, 258thSt, 1stAve

This 2018 City of Newberry project was a mill and resurface of approximately 0.37 miles of local roads SW 257th ST, 258th ST, & 1st Ave just north of Newberry High School. It including selective base repair, driveway aprons, striping, curbs ramps, and sidewalk repair.

Existing Conditions

Plans

Post-Construction

DJI_0169.JPG