Elese Tomlin Empwmt Center

We were happy to work on the Elese Tomlin Empowerment Center for the City of Groveland, FL with a great team! The new facility provides educational programs and vocational opportunities aimed at empowering community members through ESOL programs, employment services, all to make a real difference in Groveland. Constructed started several months ago and we'll be posting pictures.

City of Newberry SW Water Main Extension

The City of Newberry planned a water main extension in southwest Newberry to loop and backfeed a large portion of the City’s service area. The route and pipe sizes generally consists of 2,100 LF of 12” Watermain aligned with SW 15th Ave between SW 260th ST and west to SW 266th St, 4,100 LF of 12” watermain aligned along the eastern wide of CR337 / SW 266th St north to Newberry Rd and south to SW 18th Road, and 500 LF of 8” Watermain aligned with SW 264th ST from the proposed 12” along the SW 15th Ave alignment north to the current termination of SW 264th ST. To facilitate the project, Gmuer Engineering designed the utility construction plans, permited the water and wastewater improvements with FDEP, permitted the ROW Use and potential water main crossing of CR337 with Alachua County and SR26 with FDOT, supplied utility construction plans for construction, reviewed record drawings and as-built surveys, and certified testing results witnessed by the City.

Lake City Fire Station 2

UF IFAS Hague Dairy New Barns

UF IFAS Bldg 1250 Remodel

UF IFAS Live Oak Pavillion

Lake City US90 Sweetbreeze Drive Utility Extensions

The Lake City Distribution/Collections Department needed to extend a force main and water main to better serve the Cypress Lake Business Park. The improvements generally consisted of:

- 8” Force Main from an existing lift station at the rear of the park, to US 90, a directional bore under US90, and northeast to Turner Ave, approximately 3,600 linear ft.
- 12” Water main from US90 northeast to Turner Ave, approximately 900 linear ft.

To facilitate the project, Gmuer Engineering completed a sUAS (Drone) aerial of the project limits, developed a schematic utility plan, permitted the right-of-way use permit with FDOT and Columbia County, permitted the water improvements with FDEP, supplied the schematic utility plans for construction, and certified testing with FDEP.

UF IFAS Plant Pathology Greenhouse

UF IFAS needed to perform maintenance at the Plant Pathology Greenhouses located on the main campus. The work involves replumbing the water distribution system surrounding the greenhouses with a design that disrupts existing infrastructure as little as possible in a budget that matches the scale of the project. Gmuer Engineering complete a sUAS (Drone) aerial of the project limits to use as high resolution survey as a base for the proposed site utility plan that was able to route piping around layers of legacy equipment.

Lake City Utilities - Columbia High School

Lake City Distribution/Collections Department needed to extend water mains serving Columbia High School to loop and provide additional water and fire flow. The improvements consist of an internal 8 inch extension of from the stadium south approx 1,800 ft, an 8 inch water main extended from the B&B Store along 252 with a directional bore and onto the school property onto the existing loop. The system also proposes fire hydrants. To facilitate the project, Gmuer Engineering completed a sUAS (Drone) aerial of the project limits to save survey costs, utiltized historical SRWMD Permit Drawings to save on soft dig costs to the City, permitted the water improvements with FDEP, supply the schematic utility plans for construction, review record drawings and as-builts.

UF Law School Renovations

UF Bruton Geer Classroom Lab - Great project at UF Law School that was completed in the Spring of 2021 with the architect, Beverly Frank, AIA, CDT of BFRANK Studio and landscape architect C. Elisabeth Manley of Manley Design, LLC.

Student Life Center & Experiential Learning Hub

In 2019, UF Law renovated the entire second floor and a section of the first floor of Bruton-Geer Hall. The second floor, now Student Life Center, houses the Office of Career and Professional Development, a news nook, ample study and collaboration space for students, reservable conference rooms of varying sizes, and the Experiential Learning Hub that connects to offices on the first floor.

Construction

UF ROTC Van Fleet Hall Parking

High Springs Farmers Market

Congrats to the High Springs Farmers Market for their new facility! Here is some aerial video from from their late October Grand Opening. We were happy to help the City of High Springs develop their farmers market with Brame Heck Architects

DJI_0899.JPG
16-0057-C-100-SITE-GRAD-UTIL.jpg

Construction

2020-04-10 HSFarmersMarket Construction.jpg
2020-04-10 HSFarmersMarket Construction Elevations.jpg

Newberry Resurfacing - SW 4th, 5th, & 7th Ave

This 2019 City of Newberry project was a mill and resurface of approximately 0.33 miles of local roads SW 4th Ave, SW 5th Ave, & SW 7th Ave just east of Newberry High School. It including selective base repair, driveway aprons, striping, curbs ramps, and sidewalk repair.

18-0082 C-000 COVER.jpg
18-0082 C-101 PLAN & PROFILE.jpg

Existing Conditions

Newberry Resurfacing - SW 257thSt, 258thSt, 1stAve

This 2018 City of Newberry project was a mill and resurface of approximately 0.37 miles of local roads SW 257th ST, 258th ST, & 1st Ave just north of Newberry High School. It including selective base repair, driveway aprons, striping, curbs ramps, and sidewalk repair.

Existing Conditions

Plans

Post-Construction

DJI_0169.JPG

UF IFAS Live Oak Equipment Storage Building

UF IFAS has facilities around the state that GmuerEng provides engineering plans and permitting for expansions, maintenance, and new facilities. The Live Oak facility needed a storage facility and workroom for farm implements, tractors, and the prep associated with their use. GmuerEng permitted the plan with the SRWMD and provided site plans for construction.