Elese Tomlin Empwmt Center
We were happy to work on the Elese Tomlin Empowerment Center for the City of Groveland, FL with a great team! The new facility provides educational programs and vocational opportunities aimed at empowering community members through ESOL programs, employment services, all to make a real difference in Groveland. Constructed started several months ago and we'll be posting pictures.
Courtyard Marriott - Lake City
Located on US90 in Lake City near I-75 is a new 6-story Courtyard Marriott. Gmuer Engineering completed a master plan of the 20.67 acre property and then developed the phase 1 construction plans for this first hotel which included the main utilities, master stormwater facility, main internal driveway, the US90 FDOT directional Median opening, and the parking for the hotel. We look forward to future phases of the development. Hotel will consist of six floors with 136 Guest Rooms, Fitness Center, Bar/Bistro, Pool and Courtyard with Firepit Amenities, etc. Estimated completion date is October 2023.
City of Newberry SW Water Main Extension
The City of Newberry planned a water main extension in southwest Newberry to loop and backfeed a large portion of the City’s service area. The route and pipe sizes generally consists of 2,100 LF of 12” Watermain aligned with SW 15th Ave between SW 260th ST and west to SW 266th St, 4,100 LF of 12” watermain aligned along the eastern wide of CR337 / SW 266th St north to Newberry Rd and south to SW 18th Road, and 500 LF of 8” Watermain aligned with SW 264th ST from the proposed 12” along the SW 15th Ave alignment north to the current termination of SW 264th ST. To facilitate the project, Gmuer Engineering designed the utility construction plans, permited the water and wastewater improvements with FDEP, permitted the ROW Use and potential water main crossing of CR337 with Alachua County and SR26 with FDOT, supplied utility construction plans for construction, reviewed record drawings and as-built surveys, and certified testing results witnessed by the City.
Dunkin Barberville
It looks like Dunkin' will be coming to Barberville
Legacy Walk
This is a 36 Unit - 36 Bedroom apartment building proposed near the UF campus with 1st floor parking and an underground stormwater management facility.
Road Rangers US441 Alachua
Helping the Road Rangers have a home base in the City of Alachua
North Central Baptist Church Lobby Addition
We were glad to be a design partner on new open concept lobby for the North Central Baptist Church. The 2,500 sf addition adds tons of character and community space. We worked closely with Brame Heck Architects, Campbell Spellicy Engineering, Miller Engineering, and the contractor, Foresight Construction Group!
Holiday Inn Express - Starke, FL
Laundromat 24th Ave
Lake City Fire Station 2
UF IFAS Hague Dairy New Barns
9th Ave MiniStorage
A great Mini-Storage project north of Keystone Heights along SR100
UF IFAS Bldg 1250 Remodel
Victory Springs Independent Baptist Church
UF IFAS Live Oak Pavillion
Perry Animal Hospital
2nd Morning Star Missionary Baptist Church Building Addition
1908 Grand Weddings and Events
Come see the new 1908 Grand - Gainesville’s amazing event venue in one of its most historic buildings. Originally built in 1908 with a full restoration to its original grandeur! GmuerEng helped by designing the site plan to accommodate a rear building addition for added elevator and bathrooms, on-street pull off for guests arriving at the site, courtyard, sod, and infrastructure such as an underground stormwater management facility. Each room is filled with historic woodwork, chandeliers, character.
UF IFAS Plant Pathology Greenhouse
UF IFAS needed to perform maintenance at the Plant Pathology Greenhouses located on the main campus. The work involves replumbing the water distribution system surrounding the greenhouses with a design that disrupts existing infrastructure as little as possible in a budget that matches the scale of the project. Gmuer Engineering complete a sUAS (Drone) aerial of the project limits to use as high resolution survey as a base for the proposed site utility plan that was able to route piping around layers of legacy equipment.