Newberry Resurfacing - SW 4th, 5th, & 7th Ave

This 2019 City of Newberry project was a mill and resurface of approximately 0.33 miles of local roads SW 4th Ave, SW 5th Ave, & SW 7th Ave just east of Newberry High School. It including selective base repair, driveway aprons, striping, curbs ramps, and sidewalk repair.

18-0082 C-000 COVER.jpg
18-0082 C-101 PLAN & PROFILE.jpg

Existing Conditions

Newberry Resurfacing - SW 257thSt, 258thSt, 1stAve

This 2018 City of Newberry project was a mill and resurface of approximately 0.37 miles of local roads SW 257th ST, 258th ST, & 1st Ave just north of Newberry High School. It including selective base repair, driveway aprons, striping, curbs ramps, and sidewalk repair.

Existing Conditions

Plans

Post-Construction

DJI_0169.JPG

SE 5th Ave Striping Plan

The success of Depot Park has been extraordinary with events bringing the whole City to the park to enjoy the facility and the spectacular pop up entertainment. The influx into this historically industrial area of the City meant that we now needed to consider the active right-of-way use by the community instead of just transportation. To facilitate these events, Gmuer Engineering prepared a re-striping plan for the CRA that would be put into effect Public Works following their repaving of the SE 5th Ave. The before and after was amazing.

Steeplechase Farms Road Repairs

This private subdivision had some minor maintenance issues associated with their private roadway that they wanted to address. GmuerEng provided a schematic repair plan for use by the management company to bid the project with site work contractors.

University of Florida Traffic Signs and Islands

We had a great opportunity to help UF Transportation and Parking replace two existing vehicle exclusion zone gates with flashing signs posts. The installations maintain circulation of service, bus, and emergency vehicle access while keeping standard traffic out of these high pedestrian traffic areas. A great project we were happy to help with.

Newberry Lane Resurfacing

This project involved the preparation of schematic plans for the resurfacing of the majority of Newberry Lane - 3,600ft - between US27 and SR26 in the City of Newberry. This was the first project Gmuer Engineering designed for the City and has lead to several followup projects. These pictures are from before construction back in May 2016 and the finished project in December 2016. Construction consisted of base repair in limited areas, milling, resurfacing, driveway aprons, striping, and rumble strip replacement for safety. JWW Construction made the work look easy.