Located on US27 in High Springs, FL on 8.13 acres. The initial phase in 2017 was the RV and Boat Storage. And then planned the expansion in 2021 for the remainder of the storage facilities and site with drainage to a larger stormwater management facility. Gmuer Engineering supplemented the design plans for the drainage around the proposed buildings and aided in construction.