Zip at Haile Quarry
Dunkin Barberville
It looks like Dunkin' will be coming to Barberville

Peoples Choice Storage High Springs
Located on US27 in High Springs, FL on 8.13 acres. The initial phase in 2017 was the RV and Boat Storage. And then planned the expansion in 2021 for the remainder of the storage facilities and site with drainage to a larger stormwater management facility. Gmuer Engineering supplemented the design plans for the drainage around the proposed buildings and aided in construction.
High Springs Industrial Park Lot 4
Snappys Express Car Wash - Starke
Snappys Express Car Wash - Starke is a ±7.21 acre parcel located in Starke, FL for a carwash with drive isles, vacuum spaces, driveway connection to US 301, wet stormwater management facility, and utility service connections (water meter, sewer lift station, ). GmuerEng designed the site plan, permitted the site plan with regulatory agencies (Bradford County Site Plan, City Utility Department, FDOT Driveway, FDOT Drainage, FDOT Utility ROW Use, and the Suwannee River Water Management District), and supplied site plans for construction.
Ellianos Ocala Maricamp Rd
This Ellianos coffee is proposed on a ±1.56 ac property located east on Maricamp Rd in Ocala, FL. The project includes an ±800 sf free standing dual drive through building with associated parking lot, driveway connection to Maricamp Rd SR464, stormwater management facility, and utility service connections (meter for potable water, wastewater lateral) only minor off-site utility extensions. GmuerEng designed the site plan, permit the site plan with regulatory agencies (City of Ocala, Ocala Utilities, FDOT Driveway, FDOT Drainage, and the St Johns River Water Management District), and supplied site plans for construction.
Whittles Mini Storage
The project proposed to expand the existing mini-storage facility located in Newberry, FL by constructing three mini-storage buildings with drive isles and stormwater management facility. GmuerEng designed the site plan, permitted the site plan with regulatory agencies (City of Newberry and the Suwannee River Water Management District, FDOT Drainage, FDOT Driveway), and supplied site plans for construction.
Miller Electric Gainesville
Miller Electric wanted to start a Gainesville warehouse and remodel an existing building located at 4800 SW 13th St, Gainesville, FL 32608. In order to use the site, a rezoning of the property to a planned development was required with approval by the County Commission. Site improvements consisted of a loading dock addition to the building, a drive isle to and around the loading dock, turn-around accommodations for a semi-truck and associated minor stormwater management facility modifications. Gmuer Engineering, LLC (GmuerEng) completed the design of the site plan, permitting of the site plan with regulatory agencies (Alachua County, GRU, and the St Johns River Water Management District), and supply site plans for construction.
Dunkin Sorrento
Meridian CSU Addition
This project was to construct an addition onto the Meridian Behavioral Healthcare, Inc. Crisis Stabilization Unit (CSU). It was great to work with Brame Heck Architects, Campbell Spellicy Engineering, Miller Engineering, and Oelrich Construction.
Legacy Walk
This is a 36 Unit - 36 Bedroom apartment building proposed near the UF campus with 1st floor parking and an underground stormwater management facility.
Road Rangers US441 Alachua
Helping the Road Rangers have a home base in the City of Alachua
Zaxbys Chiefland
Ellianos Chaffee Rd - Jacksonville
Holiday Inn Express - Starke, FL
Parks Edge Subdivision
9th Ave MiniStorage
A great Mini-Storage project north of Keystone Heights along SR100