The project was constructed on a brownfield site for pesticides. Permitting through FDEP was required to provide a plan for isolating the contaminant and allow for redevelopment. The largest points of coordination with FDEP were utility installation trenches and the underground stormwater facility. It was critical that the contractor followed the brownfield construction requirements to the letter.
Project Info:
Architect: Donahue Architecture
Contractor: Crabtree Construction
Start: May 2016
End: December 2016
Permitting:
City of Neptune Beach
FL Dept of Env Protection (FDEP)
FL Dept of Transportation (FDOT)