Levy County needed a building addition on the Levy County Courthouse in Bronson, FL of approximately ±1400 sf to the southwest side with stairs to the front sidewalk, associated parking lot expansion to the west of the building addition and a sidewalk. GmuerEng designed the site plan, permitted the site plan, and supplied site plans for construction.
Meridian CSU Addition
This project was to construct an addition onto the Meridian Behavioral Healthcare, Inc. Crisis Stabilization Unit (CSU). It was great to work with Brame Heck Architects, Campbell Spellicy Engineering, Miller Engineering, and Oelrich Construction.
Lake City Fire Station 2
UF IFAS Hague Dairy New Barns
UF IFAS Bldg 1250 Remodel
UF IFAS Network Bldg
UF IFAS Plant Pathology Greenhouse
UF IFAS needed to perform maintenance at the Plant Pathology Greenhouses located on the main campus. The work involves replumbing the water distribution system surrounding the greenhouses with a design that disrupts existing infrastructure as little as possible in a budget that matches the scale of the project. Gmuer Engineering complete a sUAS (Drone) aerial of the project limits to use as high resolution survey as a base for the proposed site utility plan that was able to route piping around layers of legacy equipment.
UF Maguire Field Storage Building
Last year it was nice to help our Gators with an expansion of their Storage Building at UF Maguire Field
UF IFAS Agronomy Lab Renovations
A great example of a continuing services project with the University of Florida for UF IFAS
UF St Augustine
An interior remodel of a historic building in St Augustine.
UF IFAS Live Oak Equipment Storage Building
UF IFAS has facilities around the state that GmuerEng provides engineering plans and permitting for expansions, maintenance, and new facilities. The Live Oak facility needed a storage facility and workroom for farm implements, tractors, and the prep associated with their use. GmuerEng permitted the plan with the SRWMD and provided site plans for construction.