We designed a car wash facility within an existing parking area for the Enterprise Rent-A-Car on 39th Ave
Scooter's Coffee Gainesville North
Barron Building Trenton
Designed and Permitted in 2019 and finished construction in 2020.
Northside Shopping Center
Maintenance Plan to Find and Restore an abandoned Sewer Service for a New Retail Tenant. We employed 3D Photogrammetry to capture field markings and plumber depth finder in order to prepare a full color schematic plan for construction.
Ellianos Orange Park
Ellianos Coffee Company is a dominant regional brand and has been growing their franchise system throughout north central Florida. It was founded in 2002 by experienced entrepreneurs and coffee-lovers, Scott and Pam Stewart of Lake City who developed a successful specialty coffee shop with double-sided drive-thru serving the highest quality specialty coffee beverages in a way that would meet the demands of busy Americans. The new Orange Park site is located at 301 Blanding Blvd. Orange Park, FL 32073 within the Tuesday Morning PLaza next to the Whataburger. Designed 2019 Constructed: 2020
Top Tier Graphics And Apparel
The development proposes a 20,000 sf building with associated parking and stormwater management facility on a ±4 acre parcel in Jonesville.
Site Inspection with some free style
Farm Bureau Insurance City of Alachua
The Farm Bureau in the City of Alachua wanted to relocate to the Alachua Publix Marketplace with a new building, parking lot, and a large grassed area for community events. The site is located north of the retail strip containing Hungry Howie’s. Gmuer Engineering was happy to design the site plan, permit the site plan with regulatory agencies (City of Alachua, Suwannee River Water Management District) and supply site plans for construction.
Ellianos Coffee - City of Alachua
Ellianos Coffee Company is a dominant regional brand and has been growing their franchise system throughout north central Florida. It was founded in 2002 by experienced entrepreneurs and coffee-lovers, Scott and Pam Stewart of Lake City who developed a successful specialty coffee shop with double-sided drive-thru serving the highest quality specialty coffee beverages in a way that would meet the demands of busy Americans. The new City of Alachua site is located across from Santa Fe High School just up the hill from Publix and is poised to be a perfect location to serve the City of Alachua and Gainesville commuters via US 441. Design and permitting were challenging only due to the three road frontages operated by three separate entities and a unique business model that the local land development code had not anticipated. We were able to provide roadway connections from the front and rear, the double sided drive-thru, bypass lanes, utility connections and extensions, and seven different permitting applications plus two post approval design modifications to further reduce infrastructure costs in coordination with the City of Alachua.
Designed 2018
Constructed: 2018-2019
Martin Orthodontist Office in Lake City
This project began with a great team in 2016. Their practice caters to children and strives to be parent friendly. The theme is unique and is a great feature toward this goal. They wished to build a new building in Lake City on a 1.106 acre site consisted of Lots 9 & 10 of the Perimeter Park commercial subdivision. The lots were served by a master stormwater facility and access to a driveway from SR47 with an existing directional median opening. The design consisted of a 6,800 GFA building with associated parking lot, driveway connections, and utility service connections and grading to avoid pipes and concrete inlets. Permitting was completed with Lake City.
Beach Place Retail - Neptune Beach
The project was constructed on a brownfield site for pesticides. Permitting through FDEP was required to provide a plan for isolating the contaminant and allow for redevelopment. The largest points of coordination with FDEP were utility installation trenches and the underground stormwater facility. It was critical that the contractor followed the brownfield construction requirements to the letter.
Project Info:
Architect: Donahue Architecture
Contractor: Crabtree Construction
Start: May 2016
End: December 2016
Permitting:
City of Neptune Beach
FL Dept of Env Protection (FDEP)
FL Dept of Transportation (FDOT)