Newberry Lane Resurfacing

This project involved the preparation of schematic plans for the resurfacing of the majority of Newberry Lane - 3,600ft - between US27 and SR26 in the City of Newberry. This was the first project Gmuer Engineering designed for the City and has lead to several followup projects. These pictures are from before construction back in May 2016 and the finished project in December 2016. Construction consisted of base repair in limited areas, milling, resurfacing, driveway aprons, striping, and rumble strip replacement for safety. JWW Construction made the work look easy.



Beach Place Retail - Neptune Beach

The project was constructed on a brownfield site for pesticides. Permitting through FDEP was required to provide a plan for isolating the contaminant and allow for redevelopment. The largest points of coordination with FDEP were utility installation trenches and the underground stormwater facility. It was critical that the contractor followed the brownfield construction requirements to the letter.

Project Info:
Architect: Donahue Architecture
Contractor: Crabtree Construction
Start: May 2016
End: December 2016

Permitting:
City of Neptune Beach
FL Dept of Env Protection (FDEP)
FL Dept of Transportation (FDOT)