This is a 36 Unit - 36 Bedroom apartment building proposed near the UF campus with 1st floor parking and an underground stormwater management facility.
Road Rangers US441 Alachua
Helping the Road Rangers have a home base in the City of Alachua
Zaxbys Chiefland
North Central Baptist Church Lobby Addition
We were glad to be a design partner on new open concept lobby for the North Central Baptist Church. The 2,500 sf addition adds tons of character and community space. We worked closely with Brame Heck Architects, Campbell Spellicy Engineering, Miller Engineering, and the contractor, Foresight Construction Group!
Ellianos Chaffee Rd - Jacksonville
Holiday Inn Express - Starke, FL
Laundromat 24th Ave
Lake City Fire Station 2
Parks Edge Subdivision
UF IFAS Hague Dairy New Barns
9th Ave MiniStorage
A great Mini-Storage project north of Keystone Heights along SR100
UF IFAS Bldg 1250 Remodel
Victory Springs Independent Baptist Church
UF IFAS Live Oak Pavillion
Perry Animal Hospital
UF IFAS Network Bldg
2nd Morning Star Missionary Baptist Church Building Addition
1908 Grand Weddings and Events
Come see the new 1908 Grand - Gainesville’s amazing event venue in one of its most historic buildings. Originally built in 1908 with a full restoration to its original grandeur! GmuerEng helped by designing the site plan to accommodate a rear building addition for added elevator and bathrooms, on-street pull off for guests arriving at the site, courtyard, sod, and infrastructure such as an underground stormwater management facility. Each room is filled with historic woodwork, chandeliers, character.
Rising Star Academy
It was great to help Rising Star Academy on Waldo Rd expand into a great new building with required site improvements. Thanks to Shatkin Architecture, O'Steen Bros. Inc, Whitehurst Paving, Florida Green Keepers, Knapp Surveying, Mosley Construction
Lake City US90 Sweetbreeze Drive Utility Extensions
The Lake City Distribution/Collections Department needed to extend a force main and water main to better serve the Cypress Lake Business Park. The improvements generally consisted of:
- 8” Force Main from an existing lift station at the rear of the park, to US 90, a directional bore under US90, and northeast to Turner Ave, approximately 3,600 linear ft.
- 12” Water main from US90 northeast to Turner Ave, approximately 900 linear ft.
To facilitate the project, Gmuer Engineering completed a sUAS (Drone) aerial of the project limits, developed a schematic utility plan, permitted the right-of-way use permit with FDOT and Columbia County, permitted the water improvements with FDEP, supplied the schematic utility plans for construction, and certified testing with FDEP.
