The University of Florida (UF) needed to perform a significant maintenance reconstruction of McCarty Drive, 1,350 linear feet, while also performing strategic upgrades in critical locations to improve pedestrian accessibility and support the significant transportation loads. The project utilized Full-Depth Reclamation for the base for cost-management while reviewing geotechnical cores. GmuerEng assembled an existing conditions map from the available historical project data, prepared Roadway Construction Plans, and also addressed ADA improvements, mass transit (bus) traffic, pedestrian, and bicycle paths / lanes. Design was completed in early 2024 with construction in mid 2024.
Hyperlapse video of the UF McCarty Drive during construction in March of 2024